Palmiera 3 at The Oasis by Emaar

Palmiera 3 at The Oasis by Emaar

Redefining Luxury Waterside Living

Welcome to Palmiera 3 at The Oasis, a picturesque residential community offering a collection of exquisitely designed 4-bedroom luxury villas. Set amidst serene water elements and lush landscapes, Palmiera 3 brings together comfort, well-being, and a deep connection to nature. With interconnected waterways, mesmerizing views, and top-tier amenities, Palmiera 3 redefines luxury waterside living.

Community-Oriented Living

Palmiera 3 at The Oasis is designed with community living in mind, offering a range of activities and spaces that foster a strong sense of belonging. Enjoy easy access to parks, playgrounds, and a wealth of recreational options that make this a perfect place to raise a family.

Prime Location

Situated close to major transportation routes like D54 and E44, Palmiera 3 offers easy access to key destinations in Dubai. It is only 18 minutes from Al Maktoum International Airport, 20 minutes from Dubai Hills Estate and its amenities, and 28 minutes from Dubai Marina. Downtown Dubai and Dubai Mall are just 35 minutes away.

Spacious 4-Bedroom Villas

Palmiera 3 presents an impressive selection of 4-bedroom independent villas, with an average plot area of 8,700 sq. ft. and built-up area (BUA) of 5,800 sq. ft. These homes are crafted to offer luxurious practicality, with open-plan layouts, floor-to-ceiling windows, and elegant finishes, maximizing natural light and providing stunning views of the surrounding landscapes. Each villa is thoughtfully designed with a driver’s room annex for added convenience.

  • Classic Style Villas: 5,666 sq. ft., starting from AED 9.18M
  • Contemporary Style Villas: 5,885 sq. ft., starting from AED 9.32M
  • Chamfer Style Villas: 5,914 sq. ft., starting from AED 9.66M

Payment Plan

Palmiera 3 offers a convenient 4-year payment plan with 20% payments each year.

  • Down Payment: 10% (AUG 2024)
  • 1st Instalment: 10% (OCT 2024)
  • 2nd Instalment: 10% (MAR 2025)
  • 3rd Instalment: 10% (AUG 2025)
  • 4th Instalment (20% Construction Completion): 10% (MAR 2026)
  • 5th Instalment (40% Construction Completion): 10% (OCT 2026)
  • 6th Instalment (60% Construction Completion): 10% (MAY 2027)
  • 7th Instalment (80% Construction Completion): 10% (NOV 2027)
  • 8th Instalment (100% Construction Completion): 20% (OCT 2028)

Features

  • Lush Landscaped Areas
  • Community Parks & Playgrounds
  • Jogging & Cycling Tracks
  • Pools, Lagoons & Waterways
  • State-of-the-Art Gymnasium
  • Majestic Gatehouses
  • Resident Clubhouses
  • Indoor Multi-purpose Room
  • Beach at your Doorstep

Amenities

icon

Parks Green Spaces

icon

BBQ Area

icon

Swimming pool

icon

Kid's Play Area

icon

F&B outlets

icon

Community Center

icon

Pet Park

icon

Fitness Center

icon

Gated Community

Amenities